Skip to main content
HOSPITALITY & PROJECTS

Hotel LED Bathroom Mirrors for Room Schedules and Projects

Jiachuang Mirror supplies LED bathroom mirror configurations for hotel guestrooms, suites and project washrooms. Room schedules connect each model to dimensions, lighting, controls, mounting and packaging requirements.

Wide hotel LED bathroom mirror for a double vanity
Illustration
Key facts
  • EntityJiachuang Mirror
  • LocationXuchang, Henan, China
  • What we makeLED bathroom mirrors and bathroom vanities
  • For whomWholesale, private label, OEM and hotel/project buyers
ROOM-BY-ROOM PROJECT SUPPLY

Specify the mirror as part of each room.

Connect design intent with the room schedule, controls, installation plan, packaging and project requirements.

01

Room schedule

Room type, mirror size, quantity and drawing reference.

02

Guest experience

Task light, ambient light, anti-fog and control sequence.

03

MEP coordination

Electrical options, wall condition, mounting and installation responsibility.

04

Project reference

Selected sample, labels, packaging, room identification and spare-parts planning.

EDITABLE PROCUREMENT TOOL

Build the room-type mirror schedule before the quotation.

Use the Excel workbook to coordinate room counts, mirror dimensions, lighting, controls, electrical assumptions, artwork references and model-room status. It includes an approval checklist and calculates total mirror quantity by room type.

Download the Excel schedule
MATCH THE MIRROR TO THE ROOM

Choose a mirror direction for each room type.

Most hotel schedules mix guestrooms, suites and public areas. Start each one from the product family that fits how the room is used.

01

Standard guestroom

GuestLight LM-H01 gives consistent face lighting from twin vertical task lights. Size each variation from the room-type elevation.

02

Suite or double vanity

GrandView Duo LM-H02 is an extra-wide format with two task-light zones and ambient halo light, aligned to the basin centres.

03

Public and staff washrooms

TopLine Project LM-H03 pairs a clear mirror plane with a linear top light and familiar wall-switch operation.

04

Serviced apartments

Where guests need storage, NicheLine Cabinet LM-CB01 combines the mirror, integrated lighting and concealed storage in one product.

05

Accessible rooms

Mounting height, control position and mirror size are agreed with the designer for the accessible-room layout and kept as a separate schedule line.

06

Renovations

Existing power points, wall condition and vanity dimensions are recorded first so the new mirror fits the room as built.

PROJECT SEQUENCE

From room schedule to cartons marked for site.

  1. Schedule and drawings

    Room types, quantities, elevations and the destination market.

  2. Product mapping

    One product code and drawing reference for every room-type variation.

  3. Sample review

    Appearance, lighting, controls, labels and packaging checked on a sample.

  4. Written approval

    Drawing, sample, labels and packing method approved before production.

  5. Production by room type

    Each variation produced and labelled against its schedule line.

  6. Packing for site

    Cartons marked with the agreed room-type or area identification for distribution on site.

GuestLight hotel LED bathroom mirror illustration
Illustration
WHAT TO SHARE

Start a hotel RFQ with the details you already have.

Every step refers back to the same schedule line, so the quotation, sample, production and packing all describe the same room-type variation.

  1. Room type and estimated quantity
  2. Drawing, schedule or target dimensions
  3. Lighting and guest-control intent
  4. Destination market and electrical assumptions
  5. Preferred sample, quotation or technical next step
BUYER FAQ

Hotel LED mirror sourcing questions

Can mirrors be coordinated by room type?

Yes. Standard rooms, suites, accessible rooms and public areas can be grouped by drawing, product code and quantity so each variation stays clear.

Can one project order mix several mirror sizes?

Yes. Each room-type variation keeps its own drawing reference, product code and quantity in the schedule, so different sizes can be quoted, labelled and packed in one project without being confused on site.

Can the project use wall-switch control?

Wall-switch control can be reviewed with the room electrical plan, lighting design, anti-fog requirements and destination-market version.

Can we review a sample before the main order?

Yes. A sample of the selected configuration is reviewed for appearance, lighting, controls, labels and packaging before the project order is confirmed. A mock-up room review can be planned around the same sample.

How are renovation projects handled?

For renovations, share the existing wall condition, power-point positions and vanity dimensions with the room schedule so the mirror size, power entry and mounting can be matched to what is already installed.

Can spare mirrors or parts be included?

Spare units or replaceable components can be listed as separate lines in the schedule and quoted with the project. The parts list is confirmed for the final configuration.

How are production timing and warranty handled?

The production schedule and warranty are confirmed in writing after the configuration, sample status, quantities, packaging and destination requirements are agreed.

START YOUR SOURCING BRIEF

Have a room schedule, BOQ or drawing?

Share it with the destination market and preferred next step. We will prepare the product and commercial questions around the project.

Start your RFQsales@jiamirror.com